Sloat Restoration through Managed Retreat

Sloat Restoration through Managed Retreat
This is our original vision for Sloat Restoration - graphic courtesy of PSA and Associates and the Ocean Beach Task Force

Our Vision of Beach Restoration and Preservation

The shorelines of Ocean Beach south of Sloat Blvd and Sharp Park in Pacifica are threatened by rip-rap seawallls and long-term erosion. This blog chronicles our campaign efforts to restore these beaches. Check out the web view of this site to see our proposed solutions and how to help- in the right hand column below. For all the latest about our efforts, see our monthly posts.

We advocate a managed retreat strategy to restore both Ocean Beach south of Sloat and Sharp Park.

At Sloat, our vision involves:

A long-term plan to relocate threatened infrastructure
(including the south of Sloat Great Highway, the two oceanside parking lots and the sewer lines underneath them).

The cleanup of all the rock and rubble littering the beach.

The use of sand dunes as the primary tool to slow erosion.

For Sharp Park, we advocate the decommissioning of the golf course, the removal of the rip-rap berm, and a full restoration of the wetland.

Showing posts with label Ocean Beach. Show all posts
Showing posts with label Ocean Beach. Show all posts

Tuesday, October 11, 2011

The Next SPUR Public Workshop

Coastal Access at Sloat

Greetings Surfriders and Friends,

The SPUR website has just posted public comments from SPUR's public workshop number two, the Alternatives Phase. See http://www.spur.org/ocean-beach If you read the comment summary sections, it should become crystal clear why it is so important that people from our community show up, fully informed and ready to participate at these meetings. Again, the next and final SPUR public workshop is Saturday October 29th at the Golden Gate Park Senior Center 6101 Fulton St @ 37th Ave 10am-12:30pm. Please mark the SPUR workshop date on your calendars!

In addition, SF Baykeeper is currently featuring an informative article about sea level rise and Managed Retreat on their website. The piece mentions our plight at Sloat with a quality link to a historical background of the issue. See: http://baykeeper.org/blog/bcdc-approves-amendment-bay-plan-addressing-sea-level-rise
Finally, the Rip Curl Pro WCT contest is coming right on the heels of the last SPUR workshop. Surfrider National and the local chapter will be co-sponsoring the opening party on Tuesday November 1 at the Mezzanine. The theme of the party will be raising awareness of the Sloat issue. See more info: http://www.facebook.com/event.php?eid=258782484157893

Monday, August 8, 2011

Our Plan for Erosion Response at Ocean Beach


Greetings Surfriders and Friends,

The SPUR Ocean Beach Master Plan process is currently digesting comments from the Alternatives phase, and beginning to sketch out the Draft Master Plan. Surfrider San Francisco would like to take this time to release our preferred long term solution for Sloat, as well as our general erosion response strategy for Ocean Beach.

While we continue to call for a Managed Retreat solution, we feel it is important to recognize that any long term plan will take years to plan, permit and fund. DPW has asserted that during that time, the sewage transport box under the Great Highway could be exposed, which may cause it to rupture. A break in the box would trigger a sewage spill on Ocean Beach. None of us wants to see this happen. Therefore, our chapter has proposed a practical compromise for our long term plan: We are willing to condone a minimal impact, temporary structure to protect the transport box under specific conditions: It should come as a last resort only to avert a failure of the box, have a limited time span, and only in the context of a Managed Retreat strategy. See below.

We regret that this infrastructure was placed in such a precarious position. It is time to move forward and embrace a practical, commonsense long term plan. Managed Retreat is the best way to preserve our beach and solve the erosion conflict.

A Comprehensive Program of Managed Retreat for Ocean Beach
Surfrider Foundation, San Francisco Chapter’s Official Platform for Sloat Blvd / Ocean Beach Erosion

Summary Statement:

The Surfrider Foundation San Francisco Chapter favors infrastructure relocation and beach restoration as the primary methods to address Ocean Beach’s erosion problems. Sand nourishment is seen as a preferred interim strategy over armoring. Shoreline armoring will cause narrowing and ultimately the loss of the beach. The acceleration of sea level rise is expected to limit the effectiveness of sand nourishment in the latter part of the century, by year 2100. Therefore, retreat and realignment of development is expected to become increasingly important to provide space for the beach to survive. If critical infrastructure (e.g. the transport tunnel) is imminently threatened by erosion, armoring should be employed only as a last resort and a temporary measure in order to give The City time to plan and execute the reconfiguration or relocation of the infrastructure to a more sustainable condition.

We believe separate plans should be pursued for each of the two zones that have erosion issues: One plan for the Sloat Blvd. area / One for Central Ocean Beach. Due to the inherent uncertainty in sea level rise predictions and beach morphology, a fifty year plan, not a one hundred year plan, should first be executed for the two zones. At year thirty of the fifty year plan, an assessment and planning period should commence for both zones that will result in a new fifty year plan.

The Sloat Area: A 50 Year Plan of Managed Retreat
The City should commit to pursuing a Managed Retreat plan for Sloat. During the immediate planning/permitting/financing period of Managed Retreat, a small, temporary revetment (5ft high) could serve to protect the transport tunnel by stabilizing the toe of the bluff. Further temporary safeguarding of the tunnel may be achieved through interior reinforcement.

We are calling for a Managed Retreat plan that encompasses the following:

1. Re-route the Lake Merced Transport Tunnel and the connections from the Westside Transport Box and Pump Station so that they enter through the back side of the treatment plant. The southern section of the Westside Transport Box may also require modification to reduce the potential for exposure and loss of beach.

2. Re-route the Great Highway around the backside of the zoo.

3. Relocate Sloat’s North Parking Lot and bathroom facilities eastward from the current location to the area immediately in front of the Westside Pump Station.

4. Eliminate the Muni Bus turnaround.

5. At the south end of the affected area, relocate the south parking lot to the endpoint of the Great Highway (just before the intersection at Skyline Boulevard).

6. When opportunistic sand is available for beach nourishment, begin removal of all quarry stone revetments and rubble now littering the beach and construct a large sand berm to serve as a protective barrier for the entire area. Strengthen the dune with native plants, install sand ladder access trails, and construct a bike/walking path on the eastern side of the restored dune.

7. A plan for monitoring the new berm, as well as a plan for periodic sand nourishment should be in in place upon completion of the project.

With this strategy, the wastewater plant should have sufficient protection at its current location until its 100 year life cycle is completed. (Approximately 80 years remain).

Worst Case Scenario: If the new sand berm is severely eroded and the high tide line advances to a predefined point of emergency status at anywhere along the 3 reaches that include the pump station, zoo or the wastewater plant, then temporary armoring would be condoned only under the explicit condition to give the City time to plan and execute a relocation/reconfiguration of these structures. When complete, the temporary armor should then be removed and the beach returned to its natural state. There should be a formal mechanism to ensure future removal of any armoring.

Central Ocean Beach: A 50 Year Plan
For the next 50 years: A plan for monitoring erosion as well as aggressive sand dune nourishment/placement should be implemented along Central Ocean Beach. Nourishment areas would be identified as locations in which the high tide line has reached a certain distance from the seawall or road. As in the case of the Sloat area, a reassessment and planning period should occur at year 30. If at that time, if the beach is significantly narrower than when the first 50 year plan started, then planning should commence for the relocation of the Great Highway and the rest of the westside transport box.

Conclusion:
At Sloat, with infrastructure relocation and a renovated sand berm free of debris, the public and The City have a win-win solution. Infrastructure is protected and the public’s sandy shoreline/beach is preserved. At Central Ocean Beach, continual monitoring and timely sand nourishment should preclude the need for new armoring as well as give us the time we need to better evaluate sea level rise rates and beach morphology data. This plan does allow for flexibility if the high tide line moves inland to the point of threatening the remaining infrastructure. In such cases, temporary armoring is condoned as an emergency action under the express purpose to give The City time to relocate that infrastructure away from the ocean.

Wednesday, July 13, 2011

Victory! Dpw Permits Stopped

Just in: The Ca Coastal Commission denied approval to expand coastal armor at Sloat tonight. It was a unanimous vote. Thanks to the 500+ people who sent in letters opposing the permits. Thanks also to Sarah Damron, Katie Westfall of Save The Waves, Lara Truppelli of SandOb, Mark Massara, Wade Orbelian and others for staying until late in the evening to speak! This was an important win in our battle to restore the beach at Sloat. Stay tuned for next steps...

Wednesday, March 9, 2011

Ocean Beach Erosion Article on SFGate / SF Chronicle


The new revetment looking south. Photo taken 3/21/11 4:35pm Tide apprx. 3.2ft

Greetings Surfriders and Friends,

Last Friday March 4th, there was a front page article about erosion at Ocean Beach that featured the problem at Sloat. It also appeared Sunday March 6 in SFgate. Here's a link to the online version...

http://www.sfgate.com/cgi-bin/article.cgi?f=/c/a/2011/03/04/MNGM1I1O92.DTL

The article was well written, providing a great synopsis of the issues involved as well as where we right now in the process of finding a long term solution.

One important comment: The article seems to suggest that Coastal Armoring, Managed Retreat and Sand Nourishment are separate, mutually exclusive erosion control solutions for Sloat. They are not. We beleve in a sensible combination of strategies that emphasizes more of the last 2 methods: Managed Retreat and Sand Nourishment. Our vision consists of moving the parking lots, the road, and the wastewater tunnel out of harm's way. Then, a large sand dune (via sand nourishment) should be constructed in its place. With a sand barrier, we have an erosion control system that allows for the restoration of the public's beach and safer access to the shoreline. Look for more details to emerge on Managed Retreat as we head into the next phase of the Ocean Beach Master Plan - Alternative Solutions.

Thursday, January 28, 2010

SF Surfrider Press Release.



FOR IMMEDIATE RELEASE

Contact:

Darin Rosas

SF Surfrider Chair

darin@sfsurfrider.org

http://sloaterosionob.blogspot.com/


THE SAN FRANCISCO SURFRIDER FOUNDATION ADDRESSES COASTAL EROSION EMERGENCY AT OCEAN BEACH IN SAN FRANCISCO

San Francisco, CA (January 22, 2010) – The San Francisco Surfrider Chapter (SF Surfrider) is calling for a long-term solution to the coastal erosion problems at Ocean Beach, SF, south of Sloat Blvd. This comes in response to a declaration of a coastal erosion emergency, by the SF Department of Public Works (DPW), along the shoreline south of Sloat Boulevard

On January 7th the southbound lane of the Great Highway, south of Sloat Boulevard was closed and, on January 21st, both southbound lanes were closed. On January 15th, the DPW announced a declaration of emergency along the Great Highway due to severely eroded bluffs on the west side of the road. Currently, most of the Great Highway from Lake Merced to Golden Gate Park is closed due to a storm. Only the bus turn-around at Sloat Boulevard is open.

In recent years, the DPW has used beach nourishment to control the coastal erosion issues at Sloat Boulevard. SF Surfrider understands the need for taking emergency action to protect the current infrastructure along the Great Highway, south of Sloat Boulevard. However, SF Surfrider feels that a long-term solution is overdue.

In 2001, the Ocean Beach Taskforce, created by Mayor Willie Brown, analyzed alternate solutions for coastal erosion issues at Ocean Beach. The Taskforce concluded that the best long-term solution was a combination of beach restoration, managed retreat, and infrastructure relocation. No official long-term policy was ever adopted or executed.

Surfrider Foundation advocates long-term solutions where coastal development is threatened and suggests the goal of maximizing beach access while minimizing impacts to the beach and its ecological integrity. Under no circumstances does SF Surfrider support the permanent installation of hard retention structures along the coastline. Such structures can temporarily protect existing coastline development but have no place in beach preservation or a healthy beach ecosystem.

A community meeting is being held on Monday, January 25th at 7pm at the Park Chalet (located behind the Beach Chalet at 1000 Great Highway in San Francisco) to discuss the proposed actions at Sloat Boulevard. The DPW Project Manager, Frank Filice will be there to discuss the emergency declaration, the short-term strategy, and a process for a long-term solution.

Everyone who has an interest in the preservation and the future of Ocean Beach is encouraged to attend. The emergency declaration will go before the San Francisco Board of Supervisors for ratification the following day, Tuesday, January 26th. For questions or more information, please email the meeting organizer and Chair of the San Francisco Ocean Beach Vision Council: Lara Truppelli at Lara@beachchalet.com.

______________________________

The Surfrider Foundation, San Francisco Chapter
is a non-profit grassroots environmental organization dedicated to the protection and enjoyment of our world’s oceans, waves and beaches. Now in its 26th year, the Surfrider Foundation has grown from a small group of dedicated surfers in Malibu, California to a global movement made up of over 50,000 members and 90 chapters worldwide. For more information visit us at www.sfsurfrider.org.

###

Sunday, January 24, 2010

save sloat.

photo by sf surfrider

1.24.10

photo by sf surfrider

photo by sf surfrider

photo by sf surfrider

photo by k. riccitiello

photo by k. riccitiello

photo by k. riccitiello

photo by k. riccitiello

Friday, January 22, 2010

COMMUNITY meeting to discuss SLOAT EROSION next monday, jan 25th

A community meeting is being held next Monday, January 25th at 7pm at the Park Chalet (located behind the Beach Chalet at 1000 Great Highway). The DPW Project Manager, Frank Filice will be there to discuss the emergency declaration, short term strategy, and the process for long-term solutions for the erosion at Sloat.

Everyone who has an interest in the
preservation and future of Ocean Beach is encouraged to attend. The emergency declaration will go before the SF Board of Supervisors for ratification the following day, Tuesday the 26th.

For questions or more information, please email the organizer:
Lara Truppelli at Lara@beachchalet.com (Lara was part of the OB Taskforce and is Chair of the Ocean Beach Vision Council - so she is well informed on the issues)


Thursday, January 21, 2010

Wednesday, January 20, 2010

both southbound lanes closed on the great highway.

San Francisco DPW closed both southbound lanes of the Great Highway south of Sloat Blvd.

http://www.sfgate.com/cgi-bin/article.cgi?f=/c/a/2010/01/20/BANC1BL3DQ.DTL

This article references a 1996 Army Corps of Engineer Report that suggested coastal armoring at Sloat -- this was PRE-Ocean Beach Taskforce, which eventually lead to an Army Corps of Engineer Project that helped renourish Ocean Beach at Sloat Blvd.

The Army Corps of Engineer Project places sand annually that is dredged from the main ship channel into San Francisco Bay in the coastal zone offshore at Sloat Blvd. The goal is to deposit sand in the near-shore location that will work its way onto the shoreline and build up the width of Ocean Beach at Sloat Blvd.

More info on the Army Corps of Enginner Project at Sloat:
http://www.spn.usace.army.mil/newsrelease/newsrelease_5_21_09_SF_Ocean_Beach.html