Sloat Restoration through Managed Retreat

Sloat Restoration through Managed Retreat
This is our original vision for Sloat Restoration - graphic courtesy of PSA and Associates and the Ocean Beach Task Force

Our Vision of Beach Restoration and Preservation

The shorelines of Ocean Beach south of Sloat Blvd and Sharp Park in Pacifica are threatened by rip-rap seawallls and long-term erosion. This blog chronicles our campaign efforts to restore these beaches. Check out the web view of this site to see our proposed solutions and how to help- in the right hand column below. For all the latest about our efforts, see our monthly posts.

We advocate a managed retreat strategy to restore both Ocean Beach south of Sloat and Sharp Park.

At Sloat, our vision involves:

A long-term plan to relocate threatened infrastructure
(including the south of Sloat Great Highway, the two oceanside parking lots and the sewer lines underneath them).

The cleanup of all the rock and rubble littering the beach.

The use of sand dunes as the primary tool to slow erosion.

For Sharp Park, we advocate the decommissioning of the golf course, the removal of the rip-rap berm, and a full restoration of the wetland.

Showing posts with label Sloat Erosion SPUR Ocean Beach. Show all posts
Showing posts with label Sloat Erosion SPUR Ocean Beach. Show all posts

Monday, April 16, 2012

New Document / Video Release


Sand recovered from clearing the Great Highway is being used once again to help shore up the south Sloat bluffs.


Dear Surfriders and Friends,

The Chapter Erosion Committee has just released a new document about the history of erosion at Ocean Beach. See http://public.surfrider.org/files/a_history_of_coastal_erosion_at_ocean_beach_0412.pdf

In many ways, the challenge we face at Sloat is nothing new. There is a long record of coastal erosion at Ocean Beach. With the wisdom gained from an historical perspective, we hope to chart a new course for erosion response by our city...

We are also pleased to announce the release of a new basic informational video about the Sloat issue. Check it out by clicking this link... https://vimeo.com/40248193 Thanks to Josh Hayes of Visual Anarchy and Silvin Morgan for their help in producing this work.

In other news...

The final Ocean Beach Master plan is due to be released within the next few weeks. Please stay tuned! There is an excellent article on the OBMP in the current issue of the SPUR journal The Urbanist. See http://www.spur.org/publications/urbanist

In the meantime, at last Tuesday's meeting of the Board of Supervisors, Supervisor Carmen Chu asked Mayor Lee if he would support the recommendations of the SPUR OBMP. The Mayor said he would not only help find the money to implement it, but would take steps to expedite the plan through the bureaucracy. This is important news as the situation at Sloat needs to be addressed as quickly as possible. The sooner we take action - hopefully with a managed retreat plan - the better. Coastal erosion keeps its own schedule.

One more development: The City has resumed the practice of using sand collected from clearing the Great Highway to fill erosion hotspots at south Sloat. Although this is a short-term, "Band-Aid" style measure, sacrificial beach sand has less of an environmental impact than sandbags, rock or rubble. Perhaps most importantly, it does not promote the spread of erosion - as is the case with the armored approach.

Thursday, February 2, 2012

Sandbag Work Complete - Extended Comment Period for Draft OBMP



Dear Surfrider Supporters,

The sandbag work at Sloat's north lot is now complete. Presently, there are no other plans to add sandbags unless we experience an extreme erosion event.

Some folks may wonder what exactly constitutes such an event and when do we get them...

Generally, we get heavy beach erosion when powerful winter storms make a direct hit to our coastline. A direct hit occurs when the core of a system makes landfall bringing with it high surf, strong winds and heavy rain. Here's a little video clip of an erosion producing storm: http://www.youtube.com/watch?v=38R0NvNJG9A&context=C35c902eADOEgsToPDskIEwyjinXyPmvzKBzl2KoP4 The worse erosion for us tends to occur when a direct hit coincides with a large high tide, such as those in the 6.0 ft. range or better. Storms barreling in from the ocean can create a powerful storm surge, allowing the surf to advance much further inland than under fair weather conditions. This allows the sea to chew up or erode whatever lies in its path. Most folks have heard of storm urge associated with hurricane landfall. The storm surge that comes from our winter storms is basically the same thing. Though less dramatic, storm surge from Pacific systems can cause plenty of damage, too, especially when structures have been located too close to the sea.

The good news is that this winter, we appear to be safe. The jet stream, which carries our storm activity, has been positioned well to the north. There has been a bonanza of great weather and surf, and a reprieve for the Sloat shoreline.

In other news, SPUR has secured a grant to do the feasibility analysis for the draft proposal at Sloat. This is great news. We hope to see a full analysis of the low profile tunnel reinforcement concept along with a tunnel relocation/re-alignment option. We are particularly interested in cost/benefit issues (factoring in the value of recreation and ecology). Perhaps some combination of approaches may finally emerge. We certainly believe that any long term plan should include a phase in which the tunnel is removed from the beach.

Finally, SPUR has also extended comment period on the draft Ocean Beach Master Plan. If you have not yet added your input, there is still time. Please visit http://www.spur.org/ocean-beach There are a lot of changes being proposed for the entire beach. It behooves all of us to weigh in. Comment period ends February 29th. Thank you!

Tuesday, January 10, 2012

2012 The Home Stretch of the SPUR Ocean Beach Master Plan



Happy New Year Surfriders and Friends,

In 2011, with your help, as well as help from our allies at Save the Waves, the CA Coastal Protection Network and others, we helped de-rail a major rock armoring project at Sloat. From here on out, geotextile sand bags will be used on an emergency basis to protect vulnerable sewer infrastructure. Also, throughout 2011, many took the time to participate in shaping a long term plan for Sloat. Though yours comments, written letters, and signed petitions, a firm support for the clean-up of Sloat's shoreline has been registered in the Master Plan process.

These are great accomplishments.

What's been happening since the holiday season? Primarily, we have the initial sand bag construction project at the south end of Sloat's 1st parking lot. This was deemed an emergency problem area due to the lack of bluff material between the transport box and the ocean. We would like to again remind all our supports that we back the use of sand bags only as an interim measure. We view it as a better alternative to quarry stone and as a bridge to a managed retreat strategy.

As we start 2012, we find ourselves in the final months of the SPUR OB Master Plan. This coming year, in addition to tracking the progress of the box feasibility study, we will work to ensure that managed retreat and restoration are part and parcel of the final SPUR recommendations. We look forward to lobbying our civic leaders to take steps to adopt this vision as official policy. Stay tuned!

Saturday, December 17, 2011

Public Comments on the Draft Ocean Beach Master Plan Released


Dear Surfriders and Friends,

Public comments from the Draft Master Plan are now available on SPUR's website http://spur.org/ocean-beach

Thanks to all who submitted comments. There were some excellent points made as well as some unique and creative ideas. As for the issue of Sloat, a common theme emerged: There is widespread support for a managed retreat approach to the erosion issue. While some folks expressed skepticism and doubt about the cobble berm idea proposed by SPUR, most supported a clean up of the rubble and restoration of the shoreline. Many cited the need to have robust sand dune construction by the Army Corps. These are all concepts supported by Surfrider.

On the critical front, there was significant concern about traffic impacts caused by the re-routing of the Great Highway around the back of the zoo, especially at the Sloat intersection. This is absolutely a legitmate concern. We will work to see that this issue is addressed by SPUR as the draft gets fine tuned.

Thanks again to everyone for staying engaged with the Sloat issue and participating in the SPUR Ocean Beach Master Plan. Have a happy holiday season!

Monday, November 21, 2011

Draft Ocean Beach Master Plan Part III


Greetings Surfriders and Friends,

The comment period for the Draft Ocean Beach Master Plan has been extended until Wednesday November 23rd 5pm. If you have not done so yet, please review the plan and provide input! http://www.spur.org/ocean-beach

We have some good news to report on the city's emergency response to coastal erosion at Sloat. We received word from SFPUC that the agency intends to deploy geotextile sandbags instead of quarry stone in case of any new major erosion events between now and when a long term plan is implemented. We support this move because sandbags are easily removed, effective and much safer to traverse than quarry stone revetments.

We also have some additional information on the cobblestone berm idea outlined in the draft. Apparently there is no set schedule at this time for doing a feasibility analysis of this proposal. This means the Master Plan may be issuing a recommendation for Sloat without knowing if it is even viable. We urge SPUR and SFPUC to clear up this matter asap. It would be a tragedy to have SPUR issue a long term recommendation for Sloat that turns out to be unworkable.

As we have mentioned in previous posts, we still believe the long term plan should call for the relocation of the Lake Merced Transport Box. Perhaps the cobblestone berm approach can fit into such a plan as an interim step between sandbags and relocation. However, a robust feasibility study of the berm (that illuminates all impacts) should be completed before we can embrace this solution.

Tuesday, November 15, 2011

Draft Ocean Beach Master Plan Part II


Dear Surfriders and Friends,

I trust by now most of you have reviewed the draft master plan and have provided comment. If not, please do so as the official comment period closes this Friday 11/18 at 5pm. See: http://www.spur.org/ocean-beach There is a survey monkey link on the page for your feedback.

In the last post, the issue of the feasibility study of the Lake Merced Transport Box was covered. One other issue surrounding the Box as well as the Master Plan has to do with timelines.

It will be several years between the time that a long term plan is adopted for Sloat and when construction is completed. Surfrider believes that the city should adopt an interim erosion response plan asap. Such a plan should exclude armoring projects such as large scale quarry stone revetments. A good plan would have minimal environmental impact and have a strict expiration date. We are working through SPUR to make this happen right now. It would be a tragedy to see the master plan's recommendations get circumvented by an untimely erosion event.

One other noteworthy issue in the draft has to do with access. The draft master plans suggests several changes to beach parking. At Sloat's first lot (north) the draft recommends that parking be transferred to Sloat Blvd. This makes sense if adequate parking spaces are made available for beach access on Sloat. They should be as close as possible to the Great Highway intersection. Unfortunately, the draft is not clear on this point. We urge you to ask SPUR to incorporate this idea. Many people that come to Ocean Beach have to drive to get there. Quality parking space needs to be preserved.

Parking at the north end lots (Kelly's and VFW's) are also slated for changes. In Key Move #5 of the draft Master Plan, a proposal for charging fees for parking on peak days is floated. Surfrider urges folks to oppose any fees for access to Ocean Beach.

Saturday, November 5, 2011

The Draft Ocean Beach Master Plan


Greetings Surfriders and Friends,

The draft Master Plan is now posted on the SPUR website Additional written comments are being accepted until Friday November 18.

There are many aspects of the draft to comment on. We will do so in future blog entries. First, we would like to comment on the most important aspects of Key Move 1 and 2.

Overall, we are very encouraged to see lots of managed retreat in the plan. Key Move 1 and 2 include the re-route of the Great Highway around the back of the zoo, rubble clean-up, pull back of the parking lots and sand dune restoration. These are all measures we support.

The biggest challenge is the fate of the Lake Merced Transport Box (LMTB). The draft suggests it may be possible to leave the box on the beach, mostly buried in place with a minimal protective structure covered by cobblestone and sand. Certainly, this is a welcome step away from massive quarry stone armoring. However, it is not known whether this solution is possible. In fact, Surfrider has been told repeatedly by the city that the box cannot be exposed; that it could rupture. Apparently a feasibility study of this issue is about to get underway. We welcome this study and hope to see this question answered asap. How the study turns out may determine whether Sloat is restored or not. Surely, if the box can be left in place, we have a decent solution that allows for major beach restoration. However, if the box cannot be protected this way, it will either need to be relocated or heavily armored. If the City were to choose to do the latter, we could wind up with a seawall on the beach at Sloat instead of sand dunes.

Ultimately our organization maintains that inland relocation is the clear sustainable long term approach for the LMTB. With the box moved away from the sea, we know the beach can be fully restored while infrastructure gains maximum protection. Please note this issue in any comments you may send in to SPUR regarding the draft.

One final note: Thanks to all who showed up at the Rip Curl / Surfrider contest kick-off party last Tuesday night. Green Day showed up as special guests. A great time was had by all. Kudos to the team at Rip Curl, Surfrider National, and our chapter volunteers. A $5,000 check was donated to the Sloat Erosion Campaign.

Tuesday, November 1, 2011

Ocean Beach Master Plan Workshop #3 Report


Greetings Surfriders and Friends,

Saturday's public workshop was well attended. Thanks to all who showed up to hear about / question the draft version of the Ocean Beach Master Plan. Surfrider will provide detailed public comment when the draft is officially posted on SPUR's website . At that point, all those who could not attend the workshop will likewise have a chance to review and comment directly to SPUR on the plan. Stay tuned... Thanks for your support and staying engaged!

Tuesday, October 11, 2011

The Next SPUR Public Workshop

Coastal Access at Sloat

Greetings Surfriders and Friends,

The SPUR website has just posted public comments from SPUR's public workshop number two, the Alternatives Phase. See http://www.spur.org/ocean-beach If you read the comment summary sections, it should become crystal clear why it is so important that people from our community show up, fully informed and ready to participate at these meetings. Again, the next and final SPUR public workshop is Saturday October 29th at the Golden Gate Park Senior Center 6101 Fulton St @ 37th Ave 10am-12:30pm. Please mark the SPUR workshop date on your calendars!

In addition, SF Baykeeper is currently featuring an informative article about sea level rise and Managed Retreat on their website. The piece mentions our plight at Sloat with a quality link to a historical background of the issue. See: http://baykeeper.org/blog/bcdc-approves-amendment-bay-plan-addressing-sea-level-rise
Finally, the Rip Curl Pro WCT contest is coming right on the heels of the last SPUR workshop. Surfrider National and the local chapter will be co-sponsoring the opening party on Tuesday November 1 at the Mezzanine. The theme of the party will be raising awareness of the Sloat issue. See more info: http://www.facebook.com/event.php?eid=258782484157893

Friday, September 16, 2011

Next SPUR Public Workshop October 29th


Greetings Surfriders and Friends,

The next SPUR public workshop has been announced for Saturday October 29th at the Golden Gate Park Senior Center 6101 Fulton St. @ 37th Ave 10am-12pm. This meeting will cover the initial Draft Ocean Beach Master Plan. Please mark your calendars and spread the word. It is absolutely critical that we get the Master Plan on track now to feature a robust restoration plan for the south Sloat area.

In other news, local surfer and coastal attorney Mark Massara has recently filed a lawsuit against the City and County of San Francisco for violating permits issued by the California Coastal Commission. The suit, filed with The California Coastal Protection Network, claims the City's rock revetments at Sloat are out of compliance on multiple items found in Commission permits. This is a significant development that will will be sure to cover as things unfold...
See: http://oceanbeachbulletin.com/2011/08/26/environmental-group-sues-san-francisco-over-ocean-beach-rock-piles/

Last, but not least, an economic study of the future effects of sea level rise for Ocean Beach has just been released by Phillip King of San Francisco State University. Mr. King is also a member of SPUR's Ocean Beach Master Plan Steering Committee, so this information will inform the Master Plan.
http://blogs.kqed.org/climatewatch/2011/09/13/the-price-of-rising-seas/

In his report, King models the economic effects of a sea level rise of 1.4 meters by 2100 (the current projection). His findings show SF and its residents would sustain more than $500 million in damage to infrastructure and private property - if no proactive measures are taken. This is exactly why we have been calling for a Managed Retreat strategy for Ocean Beach. The only way to responsibly deal with an encroaching high tide line is to move back and to give the ocean its space. This is true even if economics are the chief driver. The alternative strategy of armoring is messy, expensive in its own right, and destructive to our precious coastline. See above for more photos of the unfortunate situation at Sharp Park.

Thursday, June 23, 2011

Alert: Important Meeting of the Ca. Coastal Commission


Inner Bar Surf at South Sloat - Threatened By Backwash

Heads up Surfriders and Friends,

The California Coastal Commission is set to have a vote on SFDPW's permit application to expand armoring at Sloat Boulevard. The meeting will be on Wednesday July 13, at Marin County Board of Supervisors 3501 Civic Center Drive Rm 330 San Rafael starting at 9am. This is the set of permits that goes way beyond the work needed to finish last year's emergency repairs. We have already sent in well over 100 letters from our supporters, as well as spoke directly with the Commission about this issue. Our main point remains that permitting the expansion of armoring is unnecessary, and will only serve to undermine a primary goal of the SPUR Ocean Beach Master Plan process. That objective is to create a long term plan for Ocean Beach erosion shaped by all stakeholders - public, government, and non-profits. Please come on down to comment in person if you can. If not, you are always welcome to send letters directly to the Commission. They don't allow email, so please print out your letters and send them via traditional mail: Here's the contact info.

North Central Coast District Office
Charles Lester, Senior Deputy Director
Ruby Pap, District Supervisor


45 Fremont Street, Suite 2000
San Francisco, CA 94105-2219
(415) 904-5260 or
(415) 904-5200
FAX (415) 904-5400



Thanks!

Wednesday, March 9, 2011

Ocean Beach Erosion Article on SFGate / SF Chronicle


The new revetment looking south. Photo taken 3/21/11 4:35pm Tide apprx. 3.2ft

Greetings Surfriders and Friends,

Last Friday March 4th, there was a front page article about erosion at Ocean Beach that featured the problem at Sloat. It also appeared Sunday March 6 in SFgate. Here's a link to the online version...

http://www.sfgate.com/cgi-bin/article.cgi?f=/c/a/2011/03/04/MNGM1I1O92.DTL

The article was well written, providing a great synopsis of the issues involved as well as where we right now in the process of finding a long term solution.

One important comment: The article seems to suggest that Coastal Armoring, Managed Retreat and Sand Nourishment are separate, mutually exclusive erosion control solutions for Sloat. They are not. We beleve in a sensible combination of strategies that emphasizes more of the last 2 methods: Managed Retreat and Sand Nourishment. Our vision consists of moving the parking lots, the road, and the wastewater tunnel out of harm's way. Then, a large sand dune (via sand nourishment) should be constructed in its place. With a sand barrier, we have an erosion control system that allows for the restoration of the public's beach and safer access to the shoreline. Look for more details to emerge on Managed Retreat as we head into the next phase of the Ocean Beach Master Plan - Alternative Solutions.

Thursday, February 24, 2011

Ocean Beach Master Plan Open House at the Park Chalet


Just in case you missed the SPUR workshop at the zoo January 15, there will be another chance for the public to review and comment on the Ocean Beach Master Plan. On Saturday March 5, from 10am - 12noon, the Park Chalet will host the workshop material. All folks that want to see our beach restored at Sloat are urged to weigh in at all SPUR workshops. In addition to the Sloat issue, there are other important issues getting addressed in the Master Plan: restrooms, bike paths, garbage collection, native plant restoration efforts, etc. Feel free to bring the family has there will be free root beer and facepainting for the kids. Thanks to Lara Truppelli of the Park Chalet and SandOB for sponsoring this event.

Wednesday, December 22, 2010

Coastal Commission Wrap-Up / SPUR Meeting Set



Season’s Greetings Surfriders and Friends,

Our appearance at the California Coastal Commission Meetings last week was a smashing success. We would like to thank everyone who took time to comment, whether by coming down to speak or by sending in a letter. By the way, we received well over 140 letters in support of our message to restrict rock armoring at Sloat, and to require clean-up of the rubble littering the beach. The Commission got a clear picture of what is happening down at Sloat, the basic issues involved, and our platform. It could not have gone any better.

We have more news: VERY IMPORTANT!

SPUR has just scheduled the first public workshop for determining a long term plan at Sloat this January 15th, 2011 9am-2pm at the SF Zoo Great Hall. Finally, everyone concerned about the armoring has a chance to be part of drafting a long term solution for the area. Officials from SFDPW, SFPUC, Park and Rec and others will be on hand to hear and discuss this issue as well as other matters involving Ocean Beach. We encourage everyone to attend and provide input. More details to follow.

Thanks again, and Happy Holidays!

Tuesday, November 30, 2010

SPUR Workshop Postponed / Coastal Commission Meeting In SF


Greetings fellow Surfriders and Friends,

News Update: The SPUR workshops originally scheduled for November have been postponed until sometime early next year. These are the government/public stakeholder workshops charged with drafting a recommendation to address erosion at Sloat. We will be sure to announce when we have the dates.

In the mean time, there is a huge opportunity for us to impact the state of the beach at Sloat: The California Coastal Commission, which oversees the permitting for any coastal development on the state's coastline, is having a meeting December 15, 16,, and 17th in San Francisco. There is an open public comment period every morning of these meetings. This is our chance to tell the commission what is happening at Sloat, how our beach is wiped away by erosion, and being replaced by rock and concrete rubble. Please be sure to check our action alert in the coming days. The Commission has the ability to force The City to take action and address many of the issues that concern us at Sloat: the loss of public recreation, degradation of safe access and the environmental impacts of armoring. We urge everyone to either show up at the Commission meetings to comment (public comment period opens 9-10am depending on the day), or, if unable to attend, to please write a fresh letter to the commission. Here is a link to write a letter: http://action.surfrider.org/p/dia/action/public/?action_KEY=2842 And here is more info on the meetings. http://www.coastal.ca.gov/mtgcurr.html

Thanks!

Saturday, October 2, 2010

Gearing up for SPUR Stakeholder Meetings

Greetings Surfriders and Friends,

San Francisco Planning and Urban Research (SPUR) is busy putting the final pieces together for the stakeholder process that will help bring a long term solution at Sloat. Dates are still TBA. In the meantime, DPW has provided technical reports on 2010 storm damage, and the options they are considering to complete the armoring project. http://www.sfdpw.org/index.aspx?page=724

The agency, while still acting under emergency powers, will have to get approval from the California Coastal Commission for whatever plans they select. What we can do: Please continue to send letters to the California Coastal Commission asking the agency to minimize any additional armoring at Sloat, as well as for rubble removal and clean-up as mitigation. http://www.coastal.ca.gov

In the meantime, below is a very informative article published back in June by George Wooding for the newsletter of San Francisco Tomorrow.

Winter storms and neglect devour The Great Highway at Ocean Beach

In January, Mayor Gavin Newsom declared a state of local emergency due to severe erosion which was causing parts of the Great Highway to slip into the ocean.
Yes, recent wind and rain storms eroded Ocean Beach, but this “emergency” was actually caused by years of City-deferred maintenance, inaction, and neglect. San
Francisco has long known that parts of the Great Highway — especially the 3,000-foot section between Sloat Boulevard and Fort Funston — face being permanently washed away. It’s embarrassing that City officials have once again been caught off guard by a known and often recurring problem. Isn’t this “déjà vu”?

San Francisco’s problems with Ocean Beach are manmade problems. San Francisco caused Ocean Beach’s beach-erosion problem by repeatedly increasing its size using landfill, and then building on the landfill. The current shoreline is a man-made extension. Between 1895 and the 1930’s the Ocean Beach shoreline was pushed at least two hundred feet seaward to promote urban development. Between the 1940’s and 1960’s, concrete debris, bricks, soil, and sand were used to increase the width of the beach and to form artificial bluffs. The City continued to increase the size of the beach through the 1980’s. The Pacific Ocean is now simply reclaiming the man-made beach and in-fill that has been extended into the Ocean.

The Real Problem

The City built the massive 16-year-old Lake Merced Sewage Pipe directly underneath (40 feet below) the Great Highway; it was completed in 1994 as part of the
San Francisco PUC’s $200 million Oceanside Water Pollution Control Plant. The Highway and parking lots were built on landfill the Ocean is now reclaiming. While
the 14-foot-diameter pipe was tunneled in harder native materials at elevations below the adjacent beach, it was located very close to the Ocean, below the southbound lanes of the highway. After ocean waves tore into the bluff that supports the Great Highway, the sewage pipe was just 10 yards — barely 30 feet! — from the ocean’s edge. Over 10 million gallons of Westside raw sewage and wastewater flow through this pipe following rainy conditions. The pipe takes sewage to the Oceanside
Treatment Plant where it is partially treated and then pumped through an underwater pipe for release four miles out into the sea. As the shoreline recedes, there is
a very good chance that the Lake Merced Sewage Pipe will either end up buried under the ocean floor, or exposed to the ocean. Now the southbound lanes are closed, but Department of Public Works (DPW) hopes to re-open them sometime this summer.
Any rupture of the sewage pipe could cause a huge ecological disaster, involving millions of gallons of treated and effluent (partially-treated sewage) and liquid
waste pouring into the ocean and onto the fragile coastline. Earthquake-induced liquefaction to the area would pose another distinct threat.
According to DPW, some sections of ocean bluffs south of Sloat Boulevard have eroded by up to 70 feet just within the last year. The rock crown of the Southwest Ocean Outfall Pipe — part of the plant that discharges partially-treated wastewater four miles off shore into the Pacific Ocean — is also threatened by erosion. A 2009
report filed by the Pacific Institute shows San Francisco’s sea level rose eight inches during the last 100 years, but is expected to rise an additional four-and a-
half feet — yes, feet — by 2100 due to increases in ocean temperatures and melting ice sheets. Report calculations project that Northern California’s sandy dunes could retreat an average of 558 feet (186 yards) and cliffs could recede an average of 217 feet by 2100.

Higher sea levels, coupled with high tides and fierce storms, will cause storm waves to make increasingly deeper inroads into the receding shoreline. The City has responded to the latest Ocean Beach emergency by placing a 425-foot-long rock wall —
approximately 12,000 tons of rock — south of Sloat Boulevard below the San Francisco Zoo. This rock wall or revetment starts at the base of the eroded beach area and extends up the cliff’s face. Ideally, sand will be added on top of the rock to increase the width of the Bluff. The Army Corps of Engineers — the same folks involved with the New Orleans levees — is continuing to dump sand near the revetment changing the ocean’s littoral (sand transport) current, hoping to create a beach, but the “beach nourishment” approach is limited at this location because the Ocean’s littoral current is taking sand away from this section of shore. As the surrounding edge recedes, this divergent zone is aimed directly at the Great Highway and the Lake Merced Sewage Pipe. The effect is the same as aiming water from a hose directly onto pavement, 24/7.

This emergency Ocean Beach coastal armoring is a short-term, Band-Aid approach that will gradually fail. Coastal armoring can only be engineered to accommodate a certain storm size or rise in sea level, and at Ocean Beach would require regular monitoring and constant, expensive maintenance. Besides, armoring the edge is not as effective as a natural shoreline at dissipating the energy from waves and tides. As a result, armored shorelines are more vulnerable and cause increased erosion of adjacent beaches. In July 1999, the unanimous Board of Supervisors passed Resolution 698-99, prohibiting the expenditure of funds on the use of hard rock structures (such as rock revetment or seawalls) to stabilize conditions at Ocean Beach. The City’s emergency action this winter circumvented this Resolution and began expending funds on coastal armoring of Ocean Beach. The 1999 Board Resolution also called for a long-term plan to address erosion at Ocean Beach.

In 2002, Mayor Willie Brown’s Ocean Beach Task Force issued a Resolution supporting long-term solutions “through the planning partnership process.” The Mayor
took three years before establishing, in 2005, the Ocean Beach Vision Council charged with developing a 30- to 50-year plan for Ocean Beach. The Vision Council must be wearing very dark sunglasses, since it hasn’t even issued a draft report in the five years since being created. DPW and the Recreation and Park Department
(RPD) are currently working on a plan with the Army Corps of Engineers. No one knows how much of the RPD budget is funding the coastal armoring to protect City recreation and park land.

On April 19, 2010, Supervisor Ross Mirkarimi, with the support of Supervisor Sean Elsbernd, drafted a new Board Resolution requesting a “comprehensive planning
process be re-established to develop long-term solutions to the erosion problems at Ocean Beach.” All these attempts at long-term plans are either not drafted, completed, followed or implemented. Nothing changes except the eroding shoreline’s increased risk to the 14- foot-diameter Lake Merced Sewage Pipe and the Great
Highway above it, and risks to the Southwest Ocean Outfall Pipe.

Coastal experts are recommending a gradual surrender of the coastline to the Ocean. They believe that: 1)Infrastructure such as the Great Highway and the Lake Merced Sewage Pipe may have to be moved away from coastal erosion hazard zones; 2) Coastal armoring and structural measures should be minimized, with all armoring and rubble to be removed as soon as practical; 3) A sand management plan needs to be developed
where sand is placed to maintain the beach and dunes; 4) The natural ecology of Ocean Beach’s flora and fauna needs to be re-established; and 5) There should be
extensive Ocean Beach monitoring and adaptive management. This should become the template for the City’s long overdue Ocean Beach management plan.

As the sea rises, San Franciscans will be forced to decide: Should we adapt to the changing environment, or should we try to make it adapt to us? No matter what
we do, there will be consequences down the line. It’s time to decide the fate of Ocean Beach and San Francisco’s endangered infrastructure. San Francisco needs to immediately develop a realistic, long-term Ocean Beach management plan, before the 14-foot diameter sewage pipe and the Great Highway only 40 feet above it collapse under the weight of inaction. But by the time the City actually develops a long-term plan for Ocean Beach, we may all be up to our knees in sea water filled with effluvium (odorous waste matter).

Thanks to George Wooding, President of the West of Twin Peaks Central Council