The Future of Ocean Beach? The beach at Sharp Park (Pacifica) is disappearing under a pile of armor. Click photo to see close-up.
Dear Surfriders and Friends,
Many may be surprised to hear that there is a looming threat of beach loss at central Ocean Beach. Below are a few links to scientific reports that have informed this projection. They deal with sea level rise. According to the Pacific Institute report, sea levels off the CA coast have risen 8 inches over the last 100 years. By 2100, sea level rise is predicted to rise another 1.0-1.4 meters (4’-5’). Although sea level rise projections are estimates, the trend lines behind this projection are serious. We should prepare for significant impacts. Middle Ocean Beach has been eroding for some time. We should expect beach loss to continue. However, as compared to Sloat, there is a greater opportunity to slow it down with sand nourishment and strategic sand management practices. This should allow us to buy time for proper planning.
Surfrider believes the sooner we embrace a strategy of Managed Retreat, the better off we will all be – taxpayers, beach users, and ecology. An encroaching high tide line is part of a natural process. If our city chooses to hold fast to existing boundaries, we can expect to see results like we have in the photo above. This is a group of revetments recently placed on the beach at Sharp Park, in the neighboring town of Pacifica. It's not a pretty picture. They are wiping out their beach.
This ia a graphic derived from the statewide study showing the potential erosion by 2100 based on 4.6’ of sea level rise. http://www.pwa-ltd.com/about/about_news.html#OPC_Report
The report by PWA:
http://www.pwa-ltd.com/about/news-CoastalErosion/PWA_OPC_Methods_final.pdf
Here is a link to the Pacific Institute report that this work fed into:
http://www.pacinst.org/reports/sea_level_rise/
Here is the State Adaptation Strategy that was affected by this work:
http://www.climatechange.ca.gov/adaptation/
Sloat Restoration through Managed Retreat
This is our original vision for Sloat Restoration - graphic courtesy of PSA and Associates and the Ocean Beach Task Force
Our Vision of Beach Restoration and Preservation
The shorelines of Ocean Beach south of Sloat Blvd and Sharp Park in Pacifica are threatened by rip-rap seawallls and long-term erosion. This blog chronicles our campaign efforts to restore these beaches. Check out the web view of this site to see our proposed solutions and how to help- in the right hand column below. For all the latest about our efforts, see our monthly posts.
We advocate a managed retreat strategy to restore both Ocean Beach south of Sloat and Sharp Park.
At Sloat, our vision involves:
A long-term plan to relocate threatened infrastructure
(including the south of Sloat Great Highway, the two oceanside parking lots and the sewer lines underneath them).
The cleanup of all the rock and rubble littering the beach.
The use of sand dunes as the primary tool to slow erosion.
For Sharp Park, we advocate the decommissioning of the golf course, the removal of the rip-rap berm, and a full restoration of the wetland.
Friday, August 12, 2011
Projected Sea Level Rise for Ocean Beach - Why Managed Retreat as a Long Term Strategy
Labels:
Coastal Erosion,
Managed Retreat,
Revetment,
Sea Level Rise,
Sloat
Monday, August 8, 2011
Our Plan for Erosion Response at Ocean Beach
Greetings Surfriders and Friends,
The SPUR Ocean Beach Master Plan process is currently digesting comments from the Alternatives phase, and beginning to sketch out the Draft Master Plan. Surfrider San Francisco would like to take this time to release our preferred long term solution for Sloat, as well as our general erosion response strategy for Ocean Beach.
While we continue to call for a Managed Retreat solution, we feel it is important to recognize that any long term plan will take years to plan, permit and fund. DPW has asserted that during that time, the sewage transport box under the Great Highway could be exposed, which may cause it to rupture. A break in the box would trigger a sewage spill on Ocean Beach. None of us wants to see this happen. Therefore, our chapter has proposed a practical compromise for our long term plan: We are willing to condone a minimal impact, temporary structure to protect the transport box under specific conditions: It should come as a last resort only to avert a failure of the box, have a limited time span, and only in the context of a Managed Retreat strategy. See below.
We regret that this infrastructure was placed in such a precarious position. It is time to move forward and embrace a practical, commonsense long term plan. Managed Retreat is the best way to preserve our beach and solve the erosion conflict.
A Comprehensive Program of Managed Retreat for Ocean Beach
Surfrider Foundation, San Francisco Chapter’s Official Platform for Sloat Blvd / Ocean Beach Erosion
Summary Statement:
The Surfrider Foundation San Francisco Chapter favors infrastructure relocation and beach restoration as the primary methods to address Ocean Beach’s erosion problems. Sand nourishment is seen as a preferred interim strategy over armoring. Shoreline armoring will cause narrowing and ultimately the loss of the beach. The acceleration of sea level rise is expected to limit the effectiveness of sand nourishment in the latter part of the century, by year 2100. Therefore, retreat and realignment of development is expected to become increasingly important to provide space for the beach to survive. If critical infrastructure (e.g. the transport tunnel) is imminently threatened by erosion, armoring should be employed only as a last resort and a temporary measure in order to give The City time to plan and execute the reconfiguration or relocation of the infrastructure to a more sustainable condition.
We believe separate plans should be pursued for each of the two zones that have erosion issues: One plan for the Sloat Blvd. area / One for Central Ocean Beach. Due to the inherent uncertainty in sea level rise predictions and beach morphology, a fifty year plan, not a one hundred year plan, should first be executed for the two zones. At year thirty of the fifty year plan, an assessment and planning period should commence for both zones that will result in a new fifty year plan.
The Sloat Area: A 50 Year Plan of Managed Retreat
The City should commit to pursuing a Managed Retreat plan for Sloat. During the immediate planning/permitting/financing period of Managed Retreat, a small, temporary revetment (5ft high) could serve to protect the transport tunnel by stabilizing the toe of the bluff. Further temporary safeguarding of the tunnel may be achieved through interior reinforcement.
We are calling for a Managed Retreat plan that encompasses the following:
1. Re-route the Lake Merced Transport Tunnel and the connections from the Westside Transport Box and Pump Station so that they enter through the back side of the treatment plant. The southern section of the Westside Transport Box may also require modification to reduce the potential for exposure and loss of beach.
2. Re-route the Great Highway around the backside of the zoo.
3. Relocate Sloat’s North Parking Lot and bathroom facilities eastward from the current location to the area immediately in front of the Westside Pump Station.
4. Eliminate the Muni Bus turnaround.
5. At the south end of the affected area, relocate the south parking lot to the endpoint of the Great Highway (just before the intersection at Skyline Boulevard).
6. When opportunistic sand is available for beach nourishment, begin removal of all quarry stone revetments and rubble now littering the beach and construct a large sand berm to serve as a protective barrier for the entire area. Strengthen the dune with native plants, install sand ladder access trails, and construct a bike/walking path on the eastern side of the restored dune.
7. A plan for monitoring the new berm, as well as a plan for periodic sand nourishment should be in in place upon completion of the project.
With this strategy, the wastewater plant should have sufficient protection at its current location until its 100 year life cycle is completed. (Approximately 80 years remain).
Worst Case Scenario: If the new sand berm is severely eroded and the high tide line advances to a predefined point of emergency status at anywhere along the 3 reaches that include the pump station, zoo or the wastewater plant, then temporary armoring would be condoned only under the explicit condition to give the City time to plan and execute a relocation/reconfiguration of these structures. When complete, the temporary armor should then be removed and the beach returned to its natural state. There should be a formal mechanism to ensure future removal of any armoring.
Central Ocean Beach: A 50 Year Plan
For the next 50 years: A plan for monitoring erosion as well as aggressive sand dune nourishment/placement should be implemented along Central Ocean Beach. Nourishment areas would be identified as locations in which the high tide line has reached a certain distance from the seawall or road. As in the case of the Sloat area, a reassessment and planning period should occur at year 30. If at that time, if the beach is significantly narrower than when the first 50 year plan started, then planning should commence for the relocation of the Great Highway and the rest of the westside transport box.
Conclusion:
At Sloat, with infrastructure relocation and a renovated sand berm free of debris, the public and The City have a win-win solution. Infrastructure is protected and the public’s sandy shoreline/beach is preserved. At Central Ocean Beach, continual monitoring and timely sand nourishment should preclude the need for new armoring as well as give us the time we need to better evaluate sea level rise rates and beach morphology data. This plan does allow for flexibility if the high tide line moves inland to the point of threatening the remaining infrastructure. In such cases, temporary armoring is condoned as an emergency action under the express purpose to give The City time to relocate that infrastructure away from the ocean.
Labels:
Coastal Erosion,
Managed Retreat,
Master Plan,
Ocean Beach,
Sloat
Wednesday, July 13, 2011
Victory! Dpw Permits Stopped
Just in: The Ca Coastal Commission denied approval to expand coastal armor at Sloat tonight. It was a unanimous vote. Thanks to the 500+ people who sent in letters opposing the permits. Thanks also to Sarah Damron, Katie Westfall of Save The Waves, Lara Truppelli of SandOb, Mark Massara, Wade Orbelian and others for staying until late in the evening to speak! This was an important win in our battle to restore the beach at Sloat. Stay tuned for next steps...
Labels:
Coastal Commission,
DPW,
Ocean Beach,
Sloat,
Update
Thursday, June 23, 2011
Alert: Important Meeting of the Ca. Coastal Commission
Inner Bar Surf at South Sloat - Threatened By Backwash
Heads up Surfriders and Friends,
The California Coastal Commission is set to have a vote on SFDPW's permit application to expand armoring at Sloat Boulevard. The meeting will be on Wednesday July 13, at Marin County Board of Supervisors 3501 Civic Center Drive Rm 330 San Rafael starting at 9am. This is the set of permits that goes way beyond the work needed to finish last year's emergency repairs. We have already sent in well over 100 letters from our supporters, as well as spoke directly with the Commission about this issue. Our main point remains that permitting the expansion of armoring is unnecessary, and will only serve to undermine a primary goal of the SPUR Ocean Beach Master Plan process. That objective is to create a long term plan for Ocean Beach erosion shaped by all stakeholders - public, government, and non-profits. Please come on down to comment in person if you can. If not, you are always welcome to send letters directly to the Commission. They don't allow email, so please print out your letters and send them via traditional mail: Here's the contact info.
North Central Coast District Office
Charles Lester, Senior Deputy Director
Ruby Pap, District Supervisor
45 Fremont Street, Suite 2000
San Francisco, CA 94105-2219
(415) 904-5260 or
(415) 904-5200
FAX (415) 904-5400
Thanks!
Monday, June 20, 2011
Great Highway Sand Management News
Dear Surfriders and Friends,
Good news to report. This morning, SFDPW is addressing the issue of blowing sand that has led to recent closures of the Great Highway's southbound lanes. An excavator and at least one pair of plows will be used to relocate a sandy berm that has been building up at Noriega over the last few years. Sand from the berm has been blowing right onto the highway and into the shrubbery across the street. We contacted Frank Filice of DPW to find out if the sand could be used to cover the exposed armor at Noriega St. Good news. Indeed, that is the plan. In fact, the Agency is also working with the National Park Service to cover the exposed armor at Ortega Street as well. We applaud this effort as a short term measure to preserve our beach while reducing the pressure to armor.
Wednesday, June 8, 2011
SPUR Public Workshop #2 Report
Dear Surfriders and Friends,
The SPUR public workshop went really well. Attendance was great despite the pouring rain.
Here’s a basic report:
SPUR opened the meeting by giving attendees an overview of Ocean Beach’s sand transport system, wastewater infrastructure and the erosion challenge. Then, several test case scenarios were presented showing the results of different approaches to addressing erosion and beach management. The test cases served to demonstrate the different issues involved in long term planning at Ocean Beach. For example, one scenario demonstrated what the beach would look like over the next 100 years if we were to prioritize infrastructure protection above all other issues. Naturally, with this approach, most of the southern section of Ocean Beach was wiped out, with the shoreline and dunes getting replaced by a seawall and quarry stone revetments. Another test case showed what the future would look like if we were to use habitat conservation as the dominant priority. In such a scenario we would have to relocate not only the wastewater tunnel and the Great Highway, but also part of the neighborhood along the Lower Great Highway (at mid-beach) would have to be returned to the sand. Other models showed what would happen if we were to use green infrastructure or recreational opportunities as the prime drivers. The results of these approaches showed various degrees of Managed Retreat, but with their own pluses and minuses. SPUR wants to remind everyone that these test scenarios were not actual proposals, but tools for the public to glimpse the different issues, challenges, strengths and weaknesses inherent in any long term master plan.
During the last section of the workshop, the attendees split up into break-out session groups. Each group was charged with drafting their own ideal Master Plan for the next 100 years. The hypothetical results shown in the various test scenarios sparked a very lively planning session. At the end of the meeting, the beak-out groups’ draft plans were collected by SPUR and will serve to provide feedback and direction in formation of the final Ocean Beach Master Plan. A Draft Master Plan is the next step in this process. Check out SPURs website for all the details and/or to provide additional input.
www.spur.org/oceanbeach
Thanks to all who attended!
Wednesday, May 25, 2011
Alert! Next SPUR Public Workshop Confirmed
Dear Surfriders and Friends,
News Flash...The next phase of the Ocean Beach Master Plan is officially confirmed: Saturday June 4th at the Golden Gate Park Senior Center 10am-1pm. The Center is located at 6101 Fulton St. @ 37th Ave. Please make every effort to attend and provide input. This is the critical workshop in which a solution for Sloat will begin to take shape. For more info on the workshop or The Ocean Beach Master Plan visit
http://www.spur.org/oceanbeach
Please spread the word throughout the community...
Thanks!
News Flash...The next phase of the Ocean Beach Master Plan is officially confirmed: Saturday June 4th at the Golden Gate Park Senior Center 10am-1pm. The Center is located at 6101 Fulton St. @ 37th Ave. Please make every effort to attend and provide input. This is the critical workshop in which a solution for Sloat will begin to take shape. For more info on the workshop or The Ocean Beach Master Plan visit
http://www.spur.org/oceanbeach
Please spread the word throughout the community...
Thanks!
Labels:
Community Meeting,
erosion,
Master Plan,
Sloat,
SPUR
Subscribe to:
Posts (Atom)