Sloat Restoration through Managed Retreat

Sloat Restoration through Managed Retreat
This is our original vision for Sloat Restoration - graphic courtesy of PSA and Associates and the Ocean Beach Task Force

Our Vision of Beach Restoration and Preservation

The shorelines of Ocean Beach south of Sloat Blvd and Sharp Park in Pacifica are threatened by rip-rap seawallls and long-term erosion. This blog chronicles our campaign efforts to restore these beaches. Check out the web view of this site to see our proposed solutions and how to help- in the right hand column below. For all the latest about our efforts, see our monthly posts.

We advocate a managed retreat strategy to restore both Ocean Beach south of Sloat and Sharp Park.

At Sloat, our vision involves:

A long-term plan to relocate threatened infrastructure
(including the south of Sloat Great Highway, the two oceanside parking lots and the sewer lines underneath them).

The cleanup of all the rock and rubble littering the beach.

The use of sand dunes as the primary tool to slow erosion.

For Sharp Park, we advocate the decommissioning of the golf course, the removal of the rip-rap berm, and a full restoration of the wetland.

Monday, November 21, 2011

Draft Ocean Beach Master Plan Part III


Greetings Surfriders and Friends,

The comment period for the Draft Ocean Beach Master Plan has been extended until Wednesday November 23rd 5pm. If you have not done so yet, please review the plan and provide input! http://www.spur.org/ocean-beach

We have some good news to report on the city's emergency response to coastal erosion at Sloat. We received word from SFPUC that the agency intends to deploy geotextile sandbags instead of quarry stone in case of any new major erosion events between now and when a long term plan is implemented. We support this move because sandbags are easily removed, effective and much safer to traverse than quarry stone revetments.

We also have some additional information on the cobblestone berm idea outlined in the draft. Apparently there is no set schedule at this time for doing a feasibility analysis of this proposal. This means the Master Plan may be issuing a recommendation for Sloat without knowing if it is even viable. We urge SPUR and SFPUC to clear up this matter asap. It would be a tragedy to have SPUR issue a long term recommendation for Sloat that turns out to be unworkable.

As we have mentioned in previous posts, we still believe the long term plan should call for the relocation of the Lake Merced Transport Box. Perhaps the cobblestone berm approach can fit into such a plan as an interim step between sandbags and relocation. However, a robust feasibility study of the berm (that illuminates all impacts) should be completed before we can embrace this solution.

Tuesday, November 15, 2011

Draft Ocean Beach Master Plan Part II


Dear Surfriders and Friends,

I trust by now most of you have reviewed the draft master plan and have provided comment. If not, please do so as the official comment period closes this Friday 11/18 at 5pm. See: http://www.spur.org/ocean-beach There is a survey monkey link on the page for your feedback.

In the last post, the issue of the feasibility study of the Lake Merced Transport Box was covered. One other issue surrounding the Box as well as the Master Plan has to do with timelines.

It will be several years between the time that a long term plan is adopted for Sloat and when construction is completed. Surfrider believes that the city should adopt an interim erosion response plan asap. Such a plan should exclude armoring projects such as large scale quarry stone revetments. A good plan would have minimal environmental impact and have a strict expiration date. We are working through SPUR to make this happen right now. It would be a tragedy to see the master plan's recommendations get circumvented by an untimely erosion event.

One other noteworthy issue in the draft has to do with access. The draft master plans suggests several changes to beach parking. At Sloat's first lot (north) the draft recommends that parking be transferred to Sloat Blvd. This makes sense if adequate parking spaces are made available for beach access on Sloat. They should be as close as possible to the Great Highway intersection. Unfortunately, the draft is not clear on this point. We urge you to ask SPUR to incorporate this idea. Many people that come to Ocean Beach have to drive to get there. Quality parking space needs to be preserved.

Parking at the north end lots (Kelly's and VFW's) are also slated for changes. In Key Move #5 of the draft Master Plan, a proposal for charging fees for parking on peak days is floated. Surfrider urges folks to oppose any fees for access to Ocean Beach.

Saturday, November 5, 2011

The Draft Ocean Beach Master Plan


Greetings Surfriders and Friends,

The draft Master Plan is now posted on the SPUR website Additional written comments are being accepted until Friday November 18.

There are many aspects of the draft to comment on. We will do so in future blog entries. First, we would like to comment on the most important aspects of Key Move 1 and 2.

Overall, we are very encouraged to see lots of managed retreat in the plan. Key Move 1 and 2 include the re-route of the Great Highway around the back of the zoo, rubble clean-up, pull back of the parking lots and sand dune restoration. These are all measures we support.

The biggest challenge is the fate of the Lake Merced Transport Box (LMTB). The draft suggests it may be possible to leave the box on the beach, mostly buried in place with a minimal protective structure covered by cobblestone and sand. Certainly, this is a welcome step away from massive quarry stone armoring. However, it is not known whether this solution is possible. In fact, Surfrider has been told repeatedly by the city that the box cannot be exposed; that it could rupture. Apparently a feasibility study of this issue is about to get underway. We welcome this study and hope to see this question answered asap. How the study turns out may determine whether Sloat is restored or not. Surely, if the box can be left in place, we have a decent solution that allows for major beach restoration. However, if the box cannot be protected this way, it will either need to be relocated or heavily armored. If the City were to choose to do the latter, we could wind up with a seawall on the beach at Sloat instead of sand dunes.

Ultimately our organization maintains that inland relocation is the clear sustainable long term approach for the LMTB. With the box moved away from the sea, we know the beach can be fully restored while infrastructure gains maximum protection. Please note this issue in any comments you may send in to SPUR regarding the draft.

One final note: Thanks to all who showed up at the Rip Curl / Surfrider contest kick-off party last Tuesday night. Green Day showed up as special guests. A great time was had by all. Kudos to the team at Rip Curl, Surfrider National, and our chapter volunteers. A $5,000 check was donated to the Sloat Erosion Campaign.

Tuesday, November 1, 2011

Ocean Beach Master Plan Workshop #3 Report


Greetings Surfriders and Friends,

Saturday's public workshop was well attended. Thanks to all who showed up to hear about / question the draft version of the Ocean Beach Master Plan. Surfrider will provide detailed public comment when the draft is officially posted on SPUR's website . At that point, all those who could not attend the workshop will likewise have a chance to review and comment directly to SPUR on the plan. Stay tuned... Thanks for your support and staying engaged!

Tuesday, October 11, 2011

The Next SPUR Public Workshop

Coastal Access at Sloat

Greetings Surfriders and Friends,

The SPUR website has just posted public comments from SPUR's public workshop number two, the Alternatives Phase. See http://www.spur.org/ocean-beach If you read the comment summary sections, it should become crystal clear why it is so important that people from our community show up, fully informed and ready to participate at these meetings. Again, the next and final SPUR public workshop is Saturday October 29th at the Golden Gate Park Senior Center 6101 Fulton St @ 37th Ave 10am-12:30pm. Please mark the SPUR workshop date on your calendars!

In addition, SF Baykeeper is currently featuring an informative article about sea level rise and Managed Retreat on their website. The piece mentions our plight at Sloat with a quality link to a historical background of the issue. See: http://baykeeper.org/blog/bcdc-approves-amendment-bay-plan-addressing-sea-level-rise
Finally, the Rip Curl Pro WCT contest is coming right on the heels of the last SPUR workshop. Surfrider National and the local chapter will be co-sponsoring the opening party on Tuesday November 1 at the Mezzanine. The theme of the party will be raising awareness of the Sloat issue. See more info: http://www.facebook.com/event.php?eid=258782484157893

Friday, September 16, 2011

Next SPUR Public Workshop October 29th


Greetings Surfriders and Friends,

The next SPUR public workshop has been announced for Saturday October 29th at the Golden Gate Park Senior Center 6101 Fulton St. @ 37th Ave 10am-12pm. This meeting will cover the initial Draft Ocean Beach Master Plan. Please mark your calendars and spread the word. It is absolutely critical that we get the Master Plan on track now to feature a robust restoration plan for the south Sloat area.

In other news, local surfer and coastal attorney Mark Massara has recently filed a lawsuit against the City and County of San Francisco for violating permits issued by the California Coastal Commission. The suit, filed with The California Coastal Protection Network, claims the City's rock revetments at Sloat are out of compliance on multiple items found in Commission permits. This is a significant development that will will be sure to cover as things unfold...
See: http://oceanbeachbulletin.com/2011/08/26/environmental-group-sues-san-francisco-over-ocean-beach-rock-piles/

Last, but not least, an economic study of the future effects of sea level rise for Ocean Beach has just been released by Phillip King of San Francisco State University. Mr. King is also a member of SPUR's Ocean Beach Master Plan Steering Committee, so this information will inform the Master Plan.
http://blogs.kqed.org/climatewatch/2011/09/13/the-price-of-rising-seas/

In his report, King models the economic effects of a sea level rise of 1.4 meters by 2100 (the current projection). His findings show SF and its residents would sustain more than $500 million in damage to infrastructure and private property - if no proactive measures are taken. This is exactly why we have been calling for a Managed Retreat strategy for Ocean Beach. The only way to responsibly deal with an encroaching high tide line is to move back and to give the ocean its space. This is true even if economics are the chief driver. The alternative strategy of armoring is messy, expensive in its own right, and destructive to our precious coastline. See above for more photos of the unfortunate situation at Sharp Park.

Friday, August 12, 2011

Projected Sea Level Rise for Ocean Beach - Why Managed Retreat as a Long Term Strategy


The Future of Ocean Beach? The beach at Sharp Park (Pacifica) is disappearing under a pile of armor. Click photo to see close-up.


Dear Surfriders and Friends,

Many may be surprised to hear that there is a looming threat of beach loss at central Ocean Beach. Below are a few links to scientific reports that have informed this projection. They deal with sea level rise. According to the Pacific Institute report, sea levels off the CA coast have risen 8 inches over the last 100 years. By 2100, sea level rise is predicted to rise another 1.0-1.4 meters (4’-5’). Although sea level rise projections are estimates, the trend lines behind this projection are serious. We should prepare for significant impacts. Middle Ocean Beach has been eroding for some time. We should expect beach loss to continue. However, as compared to Sloat, there is a greater opportunity to slow it down with sand nourishment and strategic sand management practices. This should allow us to buy time for proper planning.

Surfrider believes the sooner we embrace a strategy of Managed Retreat, the better off we will all be – taxpayers, beach users, and ecology. An encroaching high tide line is part of a natural process. If our city chooses to hold fast to existing boundaries, we can expect to see results like we have in the photo above. This is a group of revetments recently placed on the beach at Sharp Park, in the neighboring town of Pacifica. It's not a pretty picture. They are wiping out their beach.

This ia a graphic derived from the statewide study showing the potential erosion by 2100 based on 4.6’ of sea level rise. http://www.pwa-ltd.com/about/about_news.html#OPC_Report

The report by PWA:
http://www.pwa-ltd.com/about/news-CoastalErosion/PWA_OPC_Methods_final.pdf

Here is a link to the Pacific Institute report that this work fed into:
http://www.pacinst.org/reports/sea_level_rise/

Here is the State Adaptation Strategy that was affected by this work:
http://www.climatechange.ca.gov/adaptation/