Sloat Restoration through Managed Retreat

Sloat Restoration through Managed Retreat
This is our original vision for Sloat Restoration - graphic courtesy of PSA and Associates and the Ocean Beach Task Force

Our Vision of Beach Restoration and Preservation

The shorelines of Ocean Beach south of Sloat Blvd and Sharp Park in Pacifica are threatened by rip-rap seawallls and long-term erosion. This blog chronicles our campaign efforts to restore these beaches. Check out the web view of this site to see our proposed solutions and how to help- in the right hand column below. For all the latest about our efforts, see our monthly posts.

We advocate a managed retreat strategy to restore both Ocean Beach south of Sloat and Sharp Park.

At Sloat, our vision involves:

A long-term plan to relocate threatened infrastructure
(including the south of Sloat Great Highway, the two oceanside parking lots and the sewer lines underneath them).

The cleanup of all the rock and rubble littering the beach.

The use of sand dunes as the primary tool to slow erosion.

For Sharp Park, we advocate the decommissioning of the golf course, the removal of the rip-rap berm, and a full restoration of the wetland.

Sunday, January 19, 2014

2013-2014: A Focus on Near Term Improvements

South Sloat January 2014

Dear Surfriders and Friends, 

In 2013, the Restore Sloat Campaign continued to press its case through public outreach, participation at government meetings, regular correspondence with decision makers, ongoing media outreach and more. This past year, we saw modest near term improvements in the form of additional sand added to the erosion site. As chronicled in our previous posts, there was also recognition from public agencies that the new sand berm at Sloat needs an anchoring system so that sand does not blow drift back into the parking lots. Work is underway on that behalf as well the effort to remove some of the rock debris from the beach. While we look forward to the day when the long term plan is finally built, we will continue to work for a continual improvements.


One last thing!  The California Coastal Commission extended the deadline for public comment on its Sea Level Rise policy guidance to February 14, 2014.  If you would like to help preserve our beaches, click this link to the Commission homepage to download the document. http://www.coastal.ca.gov/index.html  Surfrider is asking the Commission to strengthen the guidance to promote long term planning based on managed retreat. 

Thanks for checking in!

Saturday, December 7, 2013

A Chance to Stand Up for Our Beaches


Thanks to this year's sand drop, a family is able to safely exit the beach.


Dear Surfriders and Friends,

There are a pair of opportunities this coming week to help with the efforts to restore the beach at Sloat and to preserve the beach at Sharp Park and other San Mateo County beaches:

A public meeting is being held on Monday 12/9/13 at the College of San Mateo
Meeting the Challenge of Sea Level Rise in San Mateo County
College of San Mateo Theater, Building 3, 
1700 W, Hillsdale Blvd., San Mateo.8:30am-12:30pm  
Here's a link to more info on the meeting - http://sanmateosealeverise.wordpress.com/agenda/ Help us remind policy makers that beach replenishment is not a silver bullet to solve all our erosion conflicts. Sea level rise and climate change driven storms will continue to erode many of our beaches despite attempts to replenish them. San Mateo County has a major case of beach loss in the northern section of Pacifica. The armoring of Sharp Park golf course is particularly troublesome  - and is chronicled in our previous blogposts. Then, there is the case of Half Moon Bay's Surfer's Beach and Martins Beach. If you can, please show up at this conference to lend a voice for long term planning based on managed retreat!

The other opportunity is the Wednesday 12/11/13 and Thursday 12/12/13,  It's a meeting of California Coastal Commission Meeting here in San Francisco - at the Radisson Hotel Fisherman's Wharf
250 Beach St, San Francisco, CA 94133 8:00am - 9:00am

The Coastal Commission venue on Wednesday is excellent for bringing up the need for commission staff to work with our local officials to bring more near term actions for Sloat. As we have noted, the long term plan being designed through SPUR will take many years to finish. We really need to remove hazardous rubble from Sloat now. Additionally, we need to remind them of the importance of maintaining sand access to the water. 

On Thursday, the Commission will take public comment on a draft report they just released that offers guidelines on responding to sea level rise and the effects of climate change. Managed retreat is mentioned as a tool in the draft. It would be helpful to call for an increased commitment to managed retreat.

Thanks for staying engaged!





Monday, November 11, 2013

Some Modest Progress For Sloat - Update on Regional Armoring Threats

High Tide Access at Sloat 2nd Parking Lot

Greetings Surfriders and Friends,

We have been in contact with folks from the SFPUC and the NPS regarding the current situation at Sloat, especially the need to enhance sand access at the south or 2nd parking lot.  The agencies understand our calls for improvements in the area, and some action has been taken.  For example, we confirmed that sand from clearing the lots has indeed been dropped over the side of the bluff to enhance access.  We also pointed out the dire need for trash cans in the area (animal/wind proof style), especially for second lot.  We are awaiting word on this as well as a general status update on the anchoring of the new dune with vegetation, and rubble removal/relocation.  Again, look for a public meeting regarding this near term work sometime this winter. When we get any news on the long term plan, it will be reported right away.

Sharp Park Update: We are still awaiting the Coastal Development Permit hearing for the "maintenance work" on the mud/quarry stone seawall in front of the lagoon.  Side Note: Back in July the Surfrider Foundation, along with Wild Equity and others were awarded attorney fees for the endangered species act lawsuit filed in 2011. We brought the ESA suit originally to force SF Park and Rec. to come up with a feasible management plan for the coastal property. While the case has resulted in a step forward for endangered species, the coastal area still lacks a sustainable management plan that includes preservation of the beach. On Thursday, November 21 (NEW DATE), there is an opportunity to help with the campaign. At 12 noon in City Hall Room 400, the SF Planning Commission will consider allowing an upgrade of the lagoon's pumping system to go forward without an environmental impact report. According to our partners at Wild Equity, the decision may be continued (postponed) until December 5, but public comment can still be registered on 11/21. We firmly believe the project has significant environmental impacts that should be documented and weighed into the decision. 

As many of you know, the pumping of the lagoon depends on the makeshift seawall on the beach. The two work together to create a fixed boundary for the lagoon which protects the golf course from flooding.  This engineered system not only impacts the area's native wildlife (which includes the state threatened Ca. Red Legged Frog and the federally endangered San Francisco Garter Snake); but it also impacts the sand supply to the beach.  In fact, the very existence of the beach in all of Pacifica is threatened by the use of seawalls. Erosion and beach loss is due to accelerate with the effects of sea level rise and climate change driven storms. Beaches need space to migrate inland if they are to survive.

Half Moon Bay Surfer's Beach: News just broke that Surfer's Beach is a long way from receiving sand replenishment from the harbor; yet Highway 1 is under severe threat that could mean additional rock armor at any time. San Mateo Surfriders are encouraged to get involved to protect their beach! See story:   http://www.hmbreview.com/news/no-quick-fix-in-sight-for-surfer-s-beach-says/article_8811fa4e-48db-11e3-b713-001a4bcf887a.html

Martins Beach Revetment: We are still awaiting a permit hearing on this from the Ca Coastal Commission. The landowner has until July 2014 to file. The good news is that Commission staff are well aware of the armoring and access issues at Martins. Add your comment in person for the public record at the December meeting of the Coastal Commission.  It will be held in San Francisco at Fisherman's Wharf on 12/11-12/12.  Mark your calendars!

Thursday, October 10, 2013

SPUR Updates San Francisco Surfrider on Master Plan Work for Sloat

Beach View at Sloat 2nd Lot:
It looks as though sand was dumped onto the rubble field this summer - probably from clearing the drifts in the parking lot. While modest, this kind of action is most welcome. The fisherman in the photo had a lot easier time reaching the water.

Dear Surfriders and Friends,

As promised, Ben Grant of the SPUR Ocean Beach Master Plan presented at October’s chapter meeting. After providing a comprehensive overview of the OBMP, Mr. Grant filled us in on recent developments for Sloat. These included: efforts to stabilize the new sand bank in front of the north parking lot with a straw bale system; a proposal to relocate some of the rubble away from the Sloat shorebreak, the status of the Army Corps of Engineers’ quest to nourish Ocean Beach with dredged sand from the shipping channel; and a look at the studies being developed to test the Lake Merced Tunnel protection concept (as outlined in the Master Plan).

Perhaps the biggest news is that plans are moving forward to shrink the footprint of the Great Highway from Sloat to Skyline.  An SFMTA traffic study is underway that may result in the consolidation of this portion of the Great Highway into two lanes:  one northbound and one southbound lane. According to SPUR, the goal is to be able to relocate beach parking away from the water’s edge.  New parking would be available in the portions of the old southbound lane.  There will eventually be a public meeting on this and other projects, so stay tuned to provide input.  

In general, we applaud the work of the SPUR team and our City agencies in trying to solve the Sloat challenge.  Moving the road gradually away from the water is definitely a step in the right direction. It is part of the managed retreat solution to erosion that our chapter has been advocating for since the 1990s. For the very near term, we hope to see more sustained action with sand replenishment. Ideally, rubble clean-up and re-alignment would also be included as part of the same project. As we have posted before, the north pacific storm track keeps its own schedule.  That means a major winter storm can strike right at our coast with little notice. It would be a shame to see another emergency quarry stone revetment on our beach before the Master Plan work is finished. Please keep up the pressure with us! It all helps - whether sending letters to officials, attending pubic meetings or just spreading the word throughout the community.

Thanks for staying engaged.

Monday, September 9, 2013

A Tale of Two Coastal Lagoons

Laguna Salada: Sharp Park's Coastal Lagoon and Beach: early 20th Century
(photo: PWA-Wild Equity Conceptual Restoration Plan and Feasibility Assessment, Laguna Salada, Pacifica, Ca)







Greetings Surfriders and Friends,

Look for a fresh update on the Implementation Phase of the Ocean Beach Master Plan at our next chapter meeting Tuesday October 1st.  7pm at the Tides Center in the Presidio 1014 Torney Ave. In the meantime, here is some more information about our campaign to restore Sharp Park:

The Sharp Park golf course, located in Pacifica, is owned by the city of San Francisco.   It was built in the 1920's on land surrounding a coastal lagoon. Just like Lake Merced, Laguna Salada of Sharp Park is fed by creeks that drain runoff from nearby hills or mountains. During winters with heavy rainfall, these lagoons fill up to the point of spilling their excess water into the ocean. When the dry months of spring and summer set in, the water levels in the lagoon stabilize, the dunes regenerate, and the process begins anew. To learn more about these watersheds and how they work, download this scientific study of Laguna Salada.

At Sloat, we have a zoo, a large sewer tunnel, and a coastal road located right near the shoreline where Lake Merced used to spill into the ocean. Restoring Lake Merced back into a fully functioning lagoon is not on the table at this point in time. However, the restoration of Laguna Salada at Sharp Park is.  A plan has been drafted to close the golf course, give the land to the National Park Service, and incorporate the watershed into the GGNRA.  The Park Service has plans to vigorously restore the native flora, fauna and natural process of the lagoon system.  Surfrider backs this proposal because restoring the watershed means removing the seawall.  This would create long term beach preservation in an area that desperately needs it. We should seize the opportunity to restore Sharp Park.

You can learn more about the issue by visiting our partner's website Wildequity.org  You can help today by writing a letter to our public officials (see column on the right).  Also, don't forget to comment on any media story regarding Sharp Park, Sloat, or other issues related to beach erosion and managed retreat.  Thanks for checking in!

Friday, August 2, 2013

Erosion of Our Nation's Coastlines: Surfrider Chapters Fight to Preserve Our Beaches

The Blight of Coastal Armor: Texas Gulf Coast  Photo: Ellis Pickett

According to Ellis, the degraded seawall in the photo is only the latest armoring scheme to protect these homes.The jagged remnants of the original seawall are now submerged somewhere out  in the surf zone. See Texas Chapter link.

Greetings Surfriders and Friends,

While we await the next opportunity to press our case for restoring the Sloat and the Sharp Park area shoreline, we thought it would be a good time to check in on other erosion campaigns led by the Surfrider Foundation (see links below).

California:
NEW! Martin's Beach at Half Moon Bay is now armored  http://martinsbeach.blogspot.com/
Highway 1 Princeton / Half Moon Bay erosion/armoring/fill project http://smc.surfrider.org/?p=802
Goleta Beach armoring / managed retreat plan: http://santabarbara.surfrider.org/issues/goleta-beach/
Ventura's C-Street (Surfer's Point) erosion / managed retreat project http://surferspoint.org/
Solana Beach and north county seawall / fill projects (San Diego County) http://sandiego.surfrider.org/campaigns/beach-preservation

Gulf Coast:
Texas beach erosion, armor, and public access law http://robnixon.blogspot.com/2013/04/the-texas-legislative-fight-for-texas.html

East Coast:
Jersey Shore beach fill and post-Sandy challenges: http://jerseyshore.surfrider.org/
Palm Beach Florida armoring and fill  http://www.surfriderpbc.org/campaigns_positionstatements.html
Cocoa Beach post fill surf break monitoring http://cocoabeach.surfrider.org/north-reach-beach-nourishment-2013/

Nearly all the campaigns share a common story-line:

Shoreline development is built without respect for the consequences of long term erosion patterns.  When the surf zone eventually threatens such development, the first reaction is to place revetments or sea walls to be used as defense.  At a certain point, when the beaches become almost entirely submerged, sand nourishment projects are used.

Usually, the armoring and sand replenishment projects buy time, restoring the beaches for a limited period. However, eventually the sand and/or shoreline access disappears under the ever encroaching surfline. A crisis or emergency typically occurs when a large storm moves in, wipes out the beach, and brings a new round of damage to remaining structures.

As we know, this just reignites the cycle.  New, "improved" armoring/beach nourishment projects are built that end up with the same result - limited, short term success at high cost.  Unfortunately, more than a few of these armoring/nourishment sites have also threatened the quality of our surfbreaks.

We say it is time to update coastal zoning plans so as to spread the use of long term strategies based on managed retreat.  With long term planning that allows for shorelines to migrate inland, we can both preserve the integrity of our nation's coastlines and avoid a parade of expensive engineering projects.

Tuesday, June 25, 2013

North Lot & Great Highway Re-Opened, Sand Realigned

Two surfers exit the water at Sloat's north lot area.
Let's replace that armor in the background with sand! Photo: B.McLaughlin

Greetings Surfriders and Friends,

Now that the sand has been cleaned off the road, the Great Highway is open for traffic once again.  Also, the north parking lot has been cleared. The excess sand that was clogging the road and lot has been pushed back on the beach.  At Sloat, the sand was moved down near the tidal zone. The result is a more relaxed grade to the new sand access, making it is easier to traverse. We hope to hear word from the SPUR team soon about a method to stabilize the sand so that it mostly stays on the beach during wind episodes.

In other erosion news, the campaign to restore Sharp Park continues. As was last reported, we were successful in getting the latest round of armoring halted with intervention by the Coastal Commission. At a certain point, an "after the fact" permit for the maintenance project will come before The Commission for approval. This will be an extremely important event which will allow all of us an opportunity to provide input on the project. As always, feel free to provide input today. Besides a written submission to the Coastal Commission, it would also be helpful to write our city's Supervisors with a cc to SF Park and Recreation Department.  Please ask our officials to preserve the beach at Sharp Park through a full restoration plan for the watershed.

Thanks for staying engaged!